Observation_Tower_SAS_04122014.doc

(16589 KB) Pobierz

 

 


University Logo Blue
Architecture and Civil Engineering

 

 

 

Programme Title(s):              BSc (Hons) Civil Engineering

BEng (Hons) Civil and Infrastructure Engineering

 

Programme Code:                            H201/202

Module Title:                                          Civil Engineering Construction

 

http://www.wbsj.org/en/utonai/images/trails/trails06.jpg

 

 

Module code:                                          4HX501

Module leader:                                          Derek Spalton

Lecturer:                                                        Simon Wood

 

Course assignment:                            Report   B

Assignment Title:                               Observation Tower report including the    

                                              model  photos.

 

Weighting:                                          15%

 

 

Issue Date:                                                        25th September 2014

 

Hand-in Date:                                          4th December 2014 (Report)

4th December 2014 (Model)

                              


First Group meeting – Date: 02/10/14

 

Present at meeting : - Sam Berry

                                     -Adrian Doehring

                                     -Simba Gunda

Agenda:                     -Share ideas

                                     -Allocate tasks

                                     -Plane of action

                                     -Decide on date of next meeting.

 

Work load allocation and duties :   

: Adrian to be in charge of the CAD drawings and site site analysis.

: Sam responsible for initial sketches , material proposals , Health and Safety            and Environmental impact.

: Simba responsible for secondary sketches , costing of materials, final project cost and site accessibility.

 

Site walk around carried out and possible location of our tower identified onsite. Also possible layout of the final finished project including road network , accessibility and car park planned.

 

 

 

 

 

 

Second Group meeting – Date: 09/10/14

 

Present at meeting : Adrian Doehring

                                 Simba Gunda

                                

 

Agenda :                   Bring everyone to speed on our project.

                                 See how far group members have gone with their                                                                                                                            

                                 tasks.

                                 Share any new ideas.

                                 Share any findings from any individual research.

 

Meeting activity :      -We clarified some issues with Simon in regards to      

                                 our Project.

                                - A decision to do design 1 and 3 in CAD and design  

                                 2 and 4 to be left as sketches was reached.

                               -A more detailed walk around survey of the site was   

                                 carried out by the present members and  

                                 photographs were taken.      

                               -Decision on location of car park and widening and 

                                refurbishment of existing foot path was made.

                              

 

Group Meeting 11/11/2014

 

Present at meeting : Adrian Doehring

                                 Simba Gunda

 

Agenda :                   Bring everyone to speed on our project.

                                 See how far group members have gone with their                                                                                                                            

                                 tasks.

                                 Share any new ideas.

                                 Share any findings from any individual research.

 

Meeting activity :     

                               -We were doing the part of element model.

                               -We were thinking about solution for stairs.

                               -We were talking about foundation of tower.

 

 

 

 

 

 

 

Group Meeting 14/11/2014

 

Present at meeting : Adrian Doehring

                                 Simba Gunda

 

Agenda :                   Bring everyone to speed on our project.

                                 See how far group members have gone with their                                                                                                                            

                                 tasks.

                                 Share any new ideas.

                                 Share any findings from any individual research.

 

Meeting activity :     

                               -We were doing the part of element model.

                               -We were thinking about solution for stairs.

                               -We were talking about foundation of tower.

 

 

 

 

 

 

 

 

 

 

Group Meeting 27/11/2014

 

Present at meeting : Adrian Doehring

                                 Simba Gunda

 

Agenda :                   Bring everyone to speed on our project.

                                 See how far group members have gone with their                                                                                                                            

                                 tasks.

                                 Share any new ideas.

                                 Share any findings from any individual research.

 

Meeting activity :     

                               -Model making

                               -We were talking about foundation of tower.

 

Group Meeting 30/11/2014

 

Present at meeting : Adrian Doehring

                                 Simba Gunda

 

Agenda :                   Bring everyone to speed on our project.

                                 See how far group members have gone with their                                                                                                                            

                                 tasks.

                                 Share any new ideas.

                                 Share any findings from any individual research.

 

Meeting activity :     

                               -Model making

                               -We were talking about material proposals , Health  

                                                   and Safety and Environmental impact.    

 

 

Group Meeting 02/12/2014

 

Present at meeting : Adrian Doehring

                                 Simba Gunda

 

Agenda :                   Bring everyone to speed on our project.

                                 See how far group members have gone with their                                                                                                                            

                                 tasks.

                                 Share any new ideas.

                                 Share any findings from any individual research.

 

Meeting activity :     

                     -Model making

                    - We have finished :cost of materials, final project cost.

 

                              

 

 

 

 

 

 

 

 

 

 

 

2 .Site analysis report.

 

 

Civil engineering procedure :

 

1.    Access to the site :  

 

The main entrance: for Observation Tower is from Watson street

C:\Users\Adrian\Desktop\way to tower.jpg

 

Through by exist bridge.

IMAG1859

 

 

 

 

After crossing the bridge. We are going through by footpath.

IMAG1861

 

IMAG1862

On the right hand side is our existing field which will be our site for the Observation Tower

 

2.    Availability of utilities (Water ,sewerage , electricity ,gas and telecommunication) :  .

a)Water

 

 

Water is not required . The pipes of water could be extended from Watson street . There is the nearest point with access to the water and Trunk Main(local)

 

 

 

 

 

 

 

 

b)Severage

 

 

 

 

 

Sewerage is not required .

 

 

 

 

 

 

 

c)Electricity

 

    

 

 

 

Solution for Electricty : The red cabel (HV 11KW) was extended to tower following black marks points. Black Point which are able to see on the map(above). Tower for cables are required. That red one cable is overhead type .

d) Gas is not required.

e)Telecommunication is not required.

 

3.    Flooding Risk : Our tower hasn’t got any flooding risk . The ground around have got plants which are natural protect shield. The ground level  is higher than surrounded area .The plants like moss, ferr are not noticed.

4.    Physical properties of the ground :

The existing plants could tell us that ground is similar as the whole field.

http://www.bgs.ac.uk/discoveringGeology/geologyOfBritain/viewer.html  27/11/2014

...